Listen Live to 106.3 Radio Lafayette
December 5, 2025
  • Facebook
  • Instagram
  • Twitter
  • YouTube
Header image
Logo

337-706-0116 | On Air Now

Dave & Mahoney | 5a - 10a | 833-YO-DUMMY
Dave & Mahoney | 5a - 10a | 833-YO-DUMMY

Menu

Skip to content
  • Home
  • On-Air
    • The Dave & Mahoney Morning Show
    • 90s at Noon
    • Tanya
    • Lancer
    • 106.3 Homegrown
  • Music & More
    • 1063 SESSIONS: IN-STUDIO
    • 106THREE Concert Connection
    • Music Report
    • Inside Story
    • Hollywood Report
  • Connect
    • Contact
    • Request A Song
    • Take Our Survey
    • Community Calendar
    • Lafayette’s Rock & Alternative 106.3 Apps & Smart Speakers
    • Text Club
      • Text Club – Terms of Use
    • Sign Up For Our 1063 Newsletter
    • Contest Rules
    • General Contest Rules
    • PSA Submission
    • Careers At Delta Media Corp.
  • Advertise With Us
  • Flash flood warning issued for SWLA, several roads closed
  • LOCAL BIZ PROFILE: Gameday Men's Health
  • Delta Media announces exclusive coverage of the New Orleans Pelicans for 2024-25 season
  • Vermilion Parish Game of the Week returns to 106.3 FM
  • ESPN, Delta Media brings home multiple LSWA awards

DOTD Announces Plans to Repair I-10 Overpass

Posted by clintdomingue on January 11, 2023 in Blogs, Clint Domingue, Latest News, Local News
Photo courtesy of Louisiana DOTD/Facebook

The overpass on I-10 is about to begin the process of getting repaired after an 18-wheeler that was hauling an excavator hit it last week.

After a lengthy investigation, it was determined that the impact resulted in catastrophic damage to three out of the eight girders. The DOTD announced on Wednesday that the repairs will take place in two phases.

The first phase of the project will include removing the damaged section of the I-10 overpass structure. There will be new girders and a bridge deck made and will be fabricated at an off-site location. This process is estimated to be completed in a few months.

While the new bridge components are being prepared, existing concrete barriers will be shifted to allow two lanes of traffic to operate on Interstate 10 eastbound. Under this temporary configuration, eastbound traffic will travel on two-11-foot lanes with a one-foot shoulder.

During this phase, the following areas will be closed: Interstate 10 eastbound overpass auxiliary lane (deceleration/acceleration lane), Inside lane of Interstate 49 northbound, I-49 northbound exit ramp from I-10 (Exit 103B), and I-10 eastbound on-ramp from I-49 (Exit 1A).

This phase is expected to take place from January 20th-22nd.

The second phase two of the project includes the final removal of necessary bridge components and installing the newly constructed girders and bridge deck. Once the last girder is removed, crews will once again utilize SPMT’s to lift the new girders and bridge deck piece into place. After all pieces are securely in place, a concrete closure pour will be performed to tie in the new components to the existing bridge overpass.

Posted in Blogs, Clint Domingue, Latest News, Local News | Tagged DOTD, I-10, I-10 Overpass, I-49, LA DOTD, Lafayette, Lafayette Parish

Related Posts

Flash flood warning issued for SWLA, several roads closed→

Festival International is here, Mon Ami!→

UL receives R1 Designation once again→

World Famous Clydesdales coming to Acadiana→

Get it on Google Play

Now Playing

Like Us on Facebook

Follow Us on Twitter

Tweets by @1063RL

©2025 KYMK-FM | Powered By: Vipology

Menu

  • EEO
  • KYMK Public File
  • Privacy Policy
  • Delta Media Corp.
HTML Snippets Powered By : XYZScripts.com